skip to Main Content

Uganda Railways Corporation’s Response to Statements Arising from the COSASE Meeting

URC affirms the following:

  1. The  four (04) locomotives purchased are fit for purpose, reliable and compatible with the Meter Gauge Railway system
  2. Currently URC personnel (Engineers  &  drivers) are being trained and tested to operate and maintain the locomotives
  3. URC is undertaking spot track improvement and modification to  the  triangles  or  the  turn  points  for  the  locomotives  to operate safely and will be completed by 15th November 2021.

URC assures its customers and general public that these locomotives are what we need to satisfy the capacity demand of our customers.

URC Management

Back To Top